How to Write a Construction Proposal in Florida
A construction proposal is the document that turns a site visit into a signed job. It tells the customer what you will build, what it costs and how they will pay. In Florida it also has to carry your license number, and if the customer's signature on it creates the deal, it has to meet the rules for residential contracts too. Statute references below are to the 2026 Florida Statutes.
Estimate, proposal, contract: what is the difference?
- Estimate. Your price for the work as you understand it so far, often given before every detail is settled.
- Proposal or bid. A specific offer: this scope, this price, these terms, good until a set date. The customer accepts by signing.
- Contract. The signed agreement that binds both sides, with the legal terms: payment schedule, permits, changes, warranty and disputes.
Many small contractors let a signed proposal serve as the contract. Then the proposal must meet every rule a contract must meet. The cleaner approach: keep the proposal as an offer and have the customer sign a separate construction agreement that attaches it as the scope.
What every construction proposal should include
- Your company name, address, phone, email and Florida license number
- The customer's name and the job address
- A proposal number, the date and a "valid until" date, since material prices move
- The scope of work, line by line, with quantities and units
- Materials by brand and model, or an allowance amount where the customer has not chosen yet
- What is included (permits, inspections, clean-up) and what is not
- Line-item prices, permit fees if included, and the total
- The deposit and how the balance is paid
- An expected start date and duration
- Signature and date lines for both sides
Florida rule 1: your license number on every proposal
Section 489.119(5)(b) says the registration or certification number of each contractor "shall appear in each offer of services, business proposal, bid, contract, or advertisement, regardless of medium." A proposal is named directly, and a PDF sent by email counts as much as a printed page. Under section 489.119(5)(e), the licensing board starts with a notice of noncompliance for a first offense and can fine or cite a contractor who does not correct it within 30 days or who repeats it.
Florida rule 2: deposits over 10 percent
If the deposit on a residential job is more than 10 percent of the contract price, section 489.126 requires you to apply for the permits within 30 days of the payment and start the work within 90 days after the permits are issued, unless you have just cause or the owner agrees in writing to a longer period. If you need more time, write the later dates into the agreement so the owner signs them. Our guide to Florida contractor deposit rules covers the penalties and the demand-letter process.
Florida rule 3: the notices once the proposal becomes the contract
If the customer's signature on your proposal is what creates the contract, two statutory notices have to be in it:
- Recovery Fund statement (section 489.1425). Every agreement or contract to repair, restore, improve or build residential real property must contain a written statement about the Florida Homeowners' Construction Recovery Fund, unless all labor and materials together are worth $2,500 or less. The board may fine a contractor up to $500 for a first violation and must fine $1,000 per violation after that.
- Construction lien law notice (section 713.015). A direct contract over $2,500 between an owner and a contractor for work on a home of up to four units must include the statutory lien law notice in at least 12-point, capitalized, boldfaced type, on the front page of the contract or on a separate page signed and dated by the owner.
Both notices have set wording. See required notices in a Florida residential construction contract for what each one says.
Write the scope so it does not become a dispute
- Describe the work by area and task, for example "replace about 600 square feet of pool deck pavers on a new sand base," not "new deck."
- Say who handles permits, HOA approval and inspections.
- List exclusions plainly: hidden damage found after demolition, electrical work beyond what is listed, landscaping repair, painting.
- State that anything not listed needs a signed change order before that work starts. See how to write a change order that gets paid.
Set a payment schedule that follows the work
Tie each payment to something the customer can see: permit issued, materials delivered, rough inspection passed, final inspection passed. Expect to hand over a waiver and release of lien with each payment. Section 713.20 sets out the standard forms for a waiver upon progress payment and a waiver upon final payment.
Checklist before you send it
- License number on the first page
- A valid-until date
- Every line has a quantity or an allowance, and exclusions are written out
- Deposit shown as a dollar amount and a percentage
- Recovery Fund and lien law notices, if the signed proposal is the contract and the job is over $2,500
This guide is general information, not legal advice. For a specific contract question, talk to a Florida attorney.
The FL Contract Forms bundle includes an editable Estimate and Proposal template with a license-number line, line-item pricing, included and excluded lists and a valid-until date, plus the residential agreement with both Florida notices built in.
- Section 489.119 (leg.state.fl.us)
- section 489.126 (leg.state.fl.us)
- section 489.1425 (leg.state.fl.us)
- section 713.015 (leg.state.fl.us)
- Section 713.20 (leg.state.fl.us)